We work on flat roofs — from a single outlet to an entire building. This page is not a set of promises but the things that actually matter when choosing a contractor: how the survey works, what you receive before the works, what is always included in the scope and what we hand over at the end.
What we do
- Survey and diagnosis. Establishing the cause, thermography, core samples, a written finding with a defined scope.
- Flat roof installation. New build and covering replacement.
- Bituminous roofing. Torch-on membrane, two-layer systems.
- Roof renovation. Including forming the fall, adding insulation and rebuilding details.
- Repair. Local damage, details, emergency call-outs.
- Green roof installation. Extensive and intensive build-ups.
- Preparation for solar arrays. Getting the roof and its details ready before installation.
- Maintenance under contract. Periodic inspections with a documented finding.
How working together proceeds
The sequence is the same whatever the size of the building — only the scope differs.
- Survey. We come out, inspect the roof and the structure from below, and take core samples where needed.
- A finding with a scope. In writing: what was found, what the cause is, what needs doing and what does not.
- A quotation against that scope. With scenarios, where the building is old and part of the picture will only emerge during stripping.
- Co-ordination. Programme, access, lifting positions, protection below, working hours.
- The works. Phased, against the forecast, photographing concealed layers.
- Handover. Water test, documentation, maintenance schedule.
Why we start with a finding rather than a figure
We start with a finding, not a figure
First we establish what is actually wrong with the roof, and only then talk about a solution. A price without a diagnosis is just a guess — one that often changes mid-job.
This is the most important thing on the page.
A figure without a scope says nothing. Two quotations can differ several times over purely because one strips the old layers and the other covers over them. Those are not different prices but different jobs.
So after a survey we always provide a finding with a defined scope. With it you can:
- Compare several quotations against the same scope.
- Understand exactly what is being paid for.
- Put a document in front of an owners’ meeting or a board.
- Separate what is urgent from what can simply be monitored.
The last point matters to us. If part of the work is not needed, we say so — and that is often more useful than any quotation.
| Service | What it covers |
|---|---|
| Flat roof covering | New covering, details, warranty |
| Renovation & repair | Assessment, renewal |
| Green roofs | Layer system, planting |
| Solar bases | The roof side under the array |
The buildings we work on
- Houses, extensions, garages. Often timber construction, where separate rules apply.
- Apartment blocks. The flat owners decide; we produce a finding suitable for an owners’ meeting.
- Commercial and industrial buildings. Profiled steel, wind zones, works without stopping operations.
- Older buildings. No documentation, several layers — we start with investigation.
- Usable roofs. Terraces and green roofs.
3
covering systems we work with: bitumen, PVC, TPO
1
the order: diagnosis first, the quotation second
2
what we always hand over: photos and documents
What is always in the scope
Whatever the size of the job, several things are always checked — because without them a new covering lasts less than it could.
- The fall. Whether water reaches the outlets and no ponds remain. If not, we propose correcting it at the same time, because separately it costs incomparably more.
- The outlets. Whether there are enough, whether they have guards, whether the junction with the covering is sound.
- Overflow provision. Where there is none, we propose adding it. It is the cheapest safety element on a roof.
- The details. Parapets, penetrations, junctions. Most leaks begin here.
- The vapour barrier. Whether it exists and whether it is sealed at the details.
- Redundant penetrations. Old mounts and brackets nobody uses are removed.
These are not add-on services — they are what makes the work worth doing. A new covering over an uncorrected fall is money into a puddle.
Emergency call-outs
Once water is entering the building, the damage is dealt with first and the cause second. That order is deliberate, and it is worth understanding.
- Stop the water. Temporary protection, diversion, ballasting.
- Record the condition. Photographs before any repair — later they will be the only evidence.
- Assess whether it is an emergency or can wait for suitable weather.
- Plan the proper solution separately, in season.
The fourth point matters most and usually goes unsaid elsewhere. Emergency work is almost never the final solution — it stops the damage while the cause remains. So we name both separately, to make sure the second is not forgotten once the ceiling has dried.
What we do not do in a hurry: apply a thick layer of sealant. It lasts a season and then has to be cleaned off — often taking the surrounding covering with it.
How a quotation is built
So that the figures are clear, and so is why some items are given as rates rather than a lump sum.
- The fixed part. What is known after the survey: area, number of details, materials, scope of work.
- Rates for findings. On an old roof part of the picture only emerges during stripping. We agree in advance what an extra layer of stripping or a structural repair costs.
- Investigation separately. Thermography and core samples, where needed.
- Optional items separately. For instance adding insulation or providing an overflow.
The second point is a matter of principle for us. On a building with several old layers, an exact fixed sum before opening the roof is a fiction — or it carries a large contingency you pay for even when nothing is found. Rates are fairer to both sides.
What we do not do
It is only fair to state the boundaries, rather than clarify them later.
- We do not produce structural calculations. Where capacity has to be assessed — before an array or a terrace, for instance — that is a structural engineer’s work. We say when it is needed.
- We do not install solar arrays. We prepare the roof and build the details; the modules are fitted by electrical contractors.
- We do not handle heritage approvals. We produce a technical solution that fits the constraints, but the approval is the owner’s or designer’s.
- We do not propose work that is not needed. If the covering is still sound, we say so — even where the survey ends without an order.
The last point is not marketing. A roof with years left does not need repairing — and a replacement carried out too early costs the same as one carried out too late.
Quality control during the works
What gets checked during the works rather than only at the end:
- The size of the opened area is set against the forecast every day.
- Concealed layers are photographed before covering — vapour barrier, fixings, details, outlet connections.
- Details are not rushed. They take longer than the field, and they should.
- The site is watched after hot work — particularly over timber construction.
- Water is run on before handover to confirm it clears without residue.
The second point benefits you rather than us. Photographs taken before covering are the only evidence of what was actually installed — five years later, if a question arises, there will be nothing else.
Maintenance under contract
Most leaks do not start suddenly but with a blocked outlet or an open lap. So we offer periodic maintenance — particularly for commercial buildings and apartment blocks.
What it covers:
- Two inspections a year — in spring after the thaw and in autumn after leaf fall.
- Clearing outlets and channels, checking the overflow.
- Reviewing the details and removing self-seeded growth.
- A documented finding with photographs after each visit.
That last point matters beyond us. Almost every serious warranty requires documented maintenance — without records it works only in theory. More in our warranty article.
What we hand over
Documentation is not a formality — five years later it is often the only evidence of what was actually installed.
- A layer schedule with specific material types and thicknesses.
- A fall and outlet plan.
- Photographs from every stage, especially of concealed layers and details before covering.
- The integrity test result.
- Warranty documents and their conditions.
- Maintenance requirements with a recommended schedule.
How to prepare before getting in touch
How to prepare before getting in touch
Photos of the problem spots, information about the building’s age and earlier work, and access details. The more that is known in advance, the more accurate the first assessment.
A few things shorten the whole process and often reduce the cost.
- The construction period and, if known, when the roof was last covered.
- Where and when it leaked. Photographs taken during the leak are worth more than a description.
- Whether there have been repairs and of what kind.
- Whether any documents exist — drawings, warranty certificates, old invoices.
- How the roof is accessed and whether that access is safe.
- Whether the building will be in use during the works.
If there are no documents, that is information too. A roof without a history means a larger investigation element, and it is better to know that in advance than to discover it during stripping.
How to compare our quotation with others
We are not asking to be trusted — we suggest comparing. But a comparison only means something at equal scope, so it is worth asking everyone the same things.
- How many layers are there now and what will you do with them? Stripping or covering over is neither the same job nor the same price.
- Is the insulation dry, and how was that established? Almost the entire scope follows from this answer.
- What will you do about the fall? If there is ponding and the answer is “leave it as it is”, the problem stays.
- Does fixing density vary at the corners? Uniform across the roof means wind zones were never calculated.
- Are the outlets being replaced, and will there be an overflow?
- What documentation will you hand over?
None of these needs technical knowledge. But the answers say more than any figure — and they apply to any contractor, not only to us.
Season
- The working season runs from late spring to autumn. Bituminous work needs a dry substrate and suitable temperatures.
- Summer is the busiest. Worth booking ahead.
- Winter — emergency and urgent work.
- Surveys run year-round. Winter is arguably more informative: you can see how the snow melts and where ice forms.
So the practical sequence is: survey and decision in winter, works at the start of the season. That avoids both haste and the summer queue.
Common questions before getting in touch
Does a survey commit me to anything? No. What it produces is a finding you can use to compare anyone’s quotations.
Can you give a price over the phone? The honest answer is no. The largest share of the cost follows from how many layers are on the roof and whether the insulation is dry, and neither can be established by phone. A figure quoted without a survey is a guess.
Does the whole covering always need replacing? No. Often a detail or a zone is enough. When repair still pays and when it does not is set out separately.
Where we work
In Vilnius, Kaunas and the surrounding regions. The urban specifics — access, lifting positions, co-ordinating works in an occupied building — are covered separately: Vilnius, Kaunas. For clients based abroad, we also set out what differs here.
Let's start with a survey
We come out, establish the cause and produce a finding with a defined scope – the kind that lets quotations be compared.
How the survey works
From call to finding: 6 steps
The conversation
We establish what is happening: where it leaked, when, whether there have been repairs and what kind of building it is.
Survey on the roof
The covering, details, outlets, fall and ponding areas are assessed — after rain where possible.
Survey from below
The structure, staining and signs of damp are checked on the top floor or in the loft.
Investigation where needed
Thermography to map damp zones, core samples to see the layers and the structure.
The finding
In writing: the cause, what needs doing, what is urgent and what does not need doing. With photographs.
The quotation
Against that scope, with scenarios where part of the picture will only emerge during stripping.
Useful reading
- The complete flat roof guide
- What drives flat roof cost
- Defects and what they mean
- What happens during replacement
- Contact — how to get in touch and what to include straight away
Frequently asked questions
The honest answer is no. The largest share of the cost follows from how many layers are on the roof and whether the insulation is dry, and neither can be established by phone. A figure quoted without a survey is a guess, and it usually guesses low.
A written finding: what was found, the cause, what needs doing, what is urgent and what does not need doing – with photographs. With that you can compare several quotations against the same scope or put a document in front of a meeting.
No. Often rebuilding a detail or replacing a zone is enough. Replacement is proposed where the insulation is wet, where ponds never dry, or where the covering has reached the end of its service life.
Yes. The works are phased, opening only as much area as can be closed by the end of the day, with protection below and agreed working hours. That is the usual arrangement on commercial buildings and apartment blocks.
From late spring to autumn; summer is the busiest, so booking ahead helps. A survey can happen any time, and winter is arguably more informative – you can see how the snow melts and where ice forms.
A layer schedule with material types, a fall and outlet plan, photographs from every stage, the integrity test result, warranty documents and maintenance requirements. The photographs of concealed layers matter most – a year later there will be no other evidence.